EtaPRO Performance and Condition Monitoring
Site Search

Agenda
2010 EtaPRO Technology Training Workshop

May 3, Monday

Heat Rate Awareness using EtaPRO and VirtualPlant Instructor-led Seminar

May 4, Tuesday

EtaPRO/VirtualPlant Workshop Sessions - Day 1

Beginner/Intermediate

Using Your New EtaPRO System

  • EtaPRO Navigation
  • Configuration Settings
  • User Management
  • Integrated Reports and Models
  • Event-based Alerts
  • Electronic Operations and Data Logs
  • Troubleshooting and Investigating Errors

EtaPRO Software Management & Security

  • Common EtaPRO Software Management Tasks
  • Configurating EtaPRO Security Settings
  • Checking and Maintaining SoftwareHealth
  • Configuring Backups
  • Adding New Users
  • Installing and Upgrading Software

Upgrading an Existing EtaPRO System

  • Review Release Notes
  • EtaPRO Support Site
  • Software Downloads
  • Server Upgrades
  • Client Upgrades

EtaPRO Web Client

  • Reviewing the New EtaPRO Web Client

Building EtaPRO Screens

  • Basic Data Displays
  • Complex Diagnostic Screens
  • Hotspots & Buttons
  • Linking to Other Programs and Documents

Developing Points and Graphs Building & Integrating VirtualPlant Models

  • Building VirtualPlant models
  • Acquiring Live EtaPRO data
  • VirtualPlant application Overview
  • Using the VirtualPlant Cycle Builder
  • Editing Components
  • Understanding Component Node and Connections
  • Running a VirtualPlant Model
  • Viewing Model Results
  • Integrating Real-time EtaPRO Data

Advanced

Throttle & Main Steam Case study Evaluations

  • Lowering Throttle Temperatures in Response to Boiler Tube Leaks
  • Throttle Temperature Affects on First Stage Pressure
  • When Lowering Throttle Pressure Increases Efficiency
  • Cost Impact of Superheat & Reheat Attemperation Spray Flows

Feedwater Heaters & Cycle Isolation Case study Evaluations

  • Effects of Removing Mid-stream Feedwater Heaters from Service
  • Boiler and Turbine Effects from Removing the Top Feedwater Heater from Service
  • Determining Failed LP Turbine Expansion Joint Failures
  • Effects of HP Feedwater Heater Emergency Drain Valve Operation
  • Effects of LP Feedwater Heater Emergency Drain Valve Operation
  • Cycle Isolation and its Affect on Plant Heat Rate:
    • Main Steam Startup Drain to Condenser
    • Cold Reheat Steam Startup Drain to Condenser
    • Hot Reheat Steam Startup Drain to Condenser
    • Deaerator Storage Tank Drain to Condenser

Combined Cycle - Rankine Cycle Case study Evaluations

  • Effects of Economizer Recirculation Flow & Bypassing
  • Effects of Gas Bypassing/Fouled Superheat Sections in HRSG
  • Effects of HRSG Heat Distribution in Superheater and Reheater Sections
  • Cycle Isolation and its Affect on Plant Heat Rate:
    • Leaking Main Steam Bypass Valve
    • Cold Reheat Drain Valve Leakage
    • Hot Reheat Drain Valve Leakage

May 5, Wednesday

EtaPRO/VirtualPlant Workshop Sessions - Day 2

Beginner/Intermediate

EPTrendSetter™ - Historical Footprinting, Filtering & Equations

  • Developing Equations and Applying Steady-state and Free Form Filters
  • Evaluate the Differences between Public and user Trends footprints
  • Gathering Historical Plant Data and Examining for Possible Equipment Issues

EPAlert™ - Event Based Reporting

  • Developing and Configuring Event-based Reports

EPReporter™ - Configuring Automated Reports

  • Enhanced Reporting Capabilities to distribute Plant and Equipment Performance and Condition Information
  • Using Advanced Array Functions for more Rapid Report Calculation
  • Using an Additional Excel add-in for Data Retrieval through EtaPRO for PI, OPC-DA, and other Data Historians

VirtualPlant Model Tuning & Benchmarking

  • Developing Benchmark Models
  • Tuning Models to Represent “Best Achievable” Targets
  • Develop Insight into how much Specific Deviations from Design are Costing in Terms of Heat Rate and/or Capacity
  • Identifying Potential Recoverable Performance through Maintenance or Operational Changes

Real-time Data Validation using VirtualPlant

  • Using a VirtualPlant Model to validate Process Data Measurements in Real-time
  • Creating On-line VirtualPlant Models that Represent Actual Plant Operation
  • Bounding VirtualPlant Models with Operating Data and Equipment Status
  • Initializing and Implementing VirtualPlant SmartDefaults

Advanced

Boiler Case study Evaluations

  • Consequences of Using PRB Coal in a Boiler Designed for Bituminous Coal
  • Impact of Low Excess Oxygen on Boiler Efficiency, Turbine Cycle Heat Rate, and Overall Plant Heat Rate
  • Impact of Increasing Pulverizer/Mill Tempering Air Flow
  • Impact of Excessive Air Preheating on Fuel Costs
  • Effects of Fouled Boiler Sections on Steam Temperatures and Downstream Heat Transfer Surfaces:
    • Waterwall Slagging
    • Secondary Superheater
    • Reheater
    • Primary Superheater
    • Economizer
    • Air Heater

Steam Turbine Case study Evaluations

  • Low HP Turbine Efficiency Affect on Boiler & Turbine Cycle Operation
  • Low IP Turbine Efficiency Relationships to Overall Plant Heat Rate
  • Low LP Turbine Efficiency Relationships to Overall Plant Heat Rate
  • Worn N2 Packings and Associated Symptoms
  • Worn Main Steam Snout Rings and Associated Symptoms

Combined Cycle - Brayton Cycle Case study Evaluations

  • Effects of Ambient Pressure, Temperature, and Relative Humidity Changes
  • Effects of Inlet Filter Differential Pressure Changes
  • Effects of Evaporative Cooling at Base Load vs. Part Load

May 6, Thursday

Morning Session: Wrap-up of EtaPRO/VirtualPlant Workshop and Industry Expert Panel Discussions

Beginner/Intermediate

EPLog™ - Operations-based & Automatic Logs

  • Creating and Managing EPLogs for Logging Daily Information and Data Creating Automatic Entries in EPLog for Key Events Automating Operator Rounds
    • Entering, Storing, and Archiving Operator Rounds Data through a variety of low-cost PDA hardwareDisplaying and Distributing Manually Collected Data in EtaPRO

VirtualPlant Thermal Audit

  • Using a Tuned VirtualPlant Model with Real-time Results from EtaPRO to Quantify the Impact of Individual Deficiencies

Advanced

Condenser Case study Evaluations

  • Effects of Increased Cooling Water Temperature
  • Condenser Sensitivity to Location and Quantity of Plugged Tube
  • Evaluating Affects of Condenser Tube Replacement on Overall Plant Heat Rate
  • Evaluation of Circulating Water Pump Power and Lower Condenser Pressure
  • Sensitivity of Condenser Cleanliness to Condenser Pressure
  • Condenser Sub-cooling and Associated Effects

Afternoon Session: Performance Troubleshooting using EtaPRO and VirtualPlant Instructor-led Seminar

May 7, Friday

Morning Session (only): Continuation and Wrap-up of Performance Troubleshooting using EtaPRO and VirtualPlant Instructor-led Seminar

Cancellation Policy

Cancellations for individuals unable to attend the conference need to be submitted in writing to Angela Moyer at amoyer@gpworldwide.com by April 15, 2010. Requests received by this date will receive a full refund. Cancellations after April 15, 2010, and no-shows will not receive refunds.